What the snapshot contains

Field completeness across 205,094 planning catalogue records
Catalogue measureRecordsShare
Planning records205,094100.0%
Received/start date field present67,34032.8%
Decision date field present168,18082.0%
Neither of those date fields present15,6257.6%
Link to a source page or document page present204,04599.5%

Date categories overlap: a record may have both dates. A stored link is a route to check the source; this analysis did not test whether every link still works.

The catalogue has 451 authority labels, or 443 after ignoring differences in case and surrounding spaces. These labels have not been reconciled to today's council boundaries and names, so they are not a count of current councils covered.

Coverage differs by area

These nearby areas illustrate the variation. They were selected around our Portsmouth base and are listed alphabetically, rather than ranked by opportunity.

Selected local examples in the same 20 September 2026 snapshot
Authority labelRecords heldLatest received/start fieldLatest decision field
East Hampshire4016 March 2026Unavailable
Eastleigh4149 September 202618 September 2026
Fareham30714 September 202616 September 2026
Havant35711 September 202615 September 2026
Portsmouth City Council1559 March 202624 April 2026

These are dates recorded in the catalogue, not dates when each council was last successfully checked. PlanIt, the planning-data aggregator recorded as the source for this snapshot, also reports collection gaps, including Portsmouth after April 2026. Read the PlanIt coverage notes.

How to use planning dates

An application can have a received date, a validation date and a later decision date. Our received/start field can come from received, validation, registration or derived start dates. The decision field can sometimes fall back to source status or update dates. The catalogue's general date can instead be a decision, received/start, discovery or creation date.

Use the named fields and the council's original record when timing matters. PlanIt's field definitions explain the distinction between received, validated and derived dates.

We found 4,715 records where the decision field predates the received/start field. Those records need source checking before calculating application durations. We have not calculated approval speeds or monthly growth from this snapshot.

For national or local-authority application totals in England, use the government's planning statistics and their definitions.

Method and limitations

We counted every planning row in one read-only snapshot of the published catalogue, refreshed at 16:38 UTC on 20 September 2026. Percentages use 205,094 as the denominator and are rounded to one decimal place. No applicant names, property addresses, customer information or source documents are included.

All planning rows in this snapshot carry PlanIt as their recorded source. Missing fields, collection gaps, changing coverage and different date definitions prevent a reliable comparison of market demand between areas or months. A catalogue refresh time does not prove that every underlying council record has just been checked.

The same site can have multiple applications, amendments or conditions. Counting records therefore does not count separate building projects. This analysis does not classify extensions or estimate how many projects will proceed.

The download preserves these dated summary measurements and their definitions. The analysis and accompanying explanation are by Planning Data Hub; source documents and drawings are not reproduced. See PlanIt's source acknowledgements.

Check the evidence before shortlisting

An application record is a research signal: it does not establish that work will proceed or that a contractor is needed. Before shortlisting one, check its reference, proposal, status and date on the original source.

Our free planning-lead qualification checklist provides a place to record those checks. The planning leads for builders guide shows how to turn that research into a useful shortlist.

Suggested citation: Planning Data Hub, Planning data coverage snapshot: 20 September 2026. Aggregate analysis of the PDH catalogue; underlying planning source recorded as PlanIt. Counts describe the catalogue at the stated time.